
Briefly:
- Public initiatives lead California’s Prime 5 bids for September 2025, together with two College of California initiatives.
- As of September 2025, ConstructConnect® is monitoring 99,000+ energetic initiatives in California and over a million nationwide.
- Prime initiatives in California embody UCLA housing, constructing the Mid-County Parkway, and UC Berkeley’s clear vitality improve.
Public initiatives dominate California’s Prime 5 building initiatives up for bid throughout September 2025, with two initiatives on College of California campuses and infrastructure work taking the opposite three.
ConstructConnect® is at the moment monitoring over 99,000 active projects in California and greater than one million projects across the country.
Listed below are 5 of probably the most invaluable building initiatives up for bid in California for September 2025, in accordance with ConstructConnect Venture Intelligence:
Don’t have Venture Intelligence?
Get access to North America’s largest project database today!
1. RFQ Building Supervisor at Danger – UCLA 901 Levering Pupil Housing
Location: Los Angeles, CA
Funds: $280,000,000
Bid Date: September 16, 2025
Begin Date: Could 18, 2026
NOTE: Necessary pre-bid assembly occurred August 25, 2025
The College of California, Los Angeles (UCLA) plans to demolish 5 ageing residential buildings in Los Angeles to assemble a 19-story, 310,000-square-foot pupil housing facility with 145 flats.
2. Mid County Parkway/Ramona Expressway Building Contract 3 Venture
Location: Riverside, CA
Funds: $210,000,000
Bid Date: September 10, 2025
Begin Date: December 12, 2025
This undertaking is a part of a years-long effort to construct a brand new highway (Mid County Parkway) and substitute parts of an present highway (Ramona Expressway), to be able to cut back visitors in a congested space. This portion requires sitework and paving.
3. RFQ Contractor – Coyote Creek Flood Safety Venture
Location: San Jose, CA
Funds: $160,000,000
Bid Date: September 24, 2025
Begin Date: June 1, 2026
This San Jose water and sewer undertaking requires demolition, flood safety measures together with floodwalls, gates, and limitations, drainage set up, and landscaping with ongoing upkeep. It additionally requires retrofitting the Charcot Bridge.
4. Decrease Central Interceptor Rehabilitation Venture
Location: Sacramento, CA
Funds: $141,600,000
Bid Date: September 17, 2025
Begin Date: November 17, 2025
NOTE: Necessary pre-bid assembly occurred August 25, 2025
One other water and sewer itemizing, the Decrease Central Interceptor Rehabilitation Venture in Sacramento includes 6.6 miles of sewer rehabilitation. The successful bidder is being requested to provide labor, supplies, instruments, and gear to improve the Central Interceptor from the Bradshaw/Central Junction to the Influent Junction.
5. RFQ Building Supervisor at Danger – Berkeley Clear Vitality Campus – Electrified Heating and Cooling Plant
Location: Berkeley, CA
Funds: $138,000,000
Bid Date: September 18, 2025
Begin Date: Could 18, 2026
This undertaking at College of California, Berkeley includes changing the campus’ steam infrastructure with heating and chilled water methods, establishing a brand new Electrified Heating and Cooling Plant (EHCP), putting in utility distribution piping, and changing buildings to the brand new methods.
Trending Merchandise
CRAFTSMAN Pliers, 8 & 10″, 2Piece Groove Joint Set (CMHT82547)
TT TRSMIMA Safety Harness Fall Protection Upgrade 4 Quick Buckles Construction Full Body Harness 6 Adjustment D-ring
BIC Wite-Out Brand EZ Correct Correction Tape, 19.8 Feet, 4-Count Pack of White Correction Tape, Fast, Clean and Easy to Use Tear-Resistant Tape Office or School Supplies