Your Trusted DIY Partner – Affordable Tools & Expert Solutions for Every Home Project!

Critical Path | Engineering News-Record

For greater than a dozen years, ENR has carried out the International Greatest Tasks competitors by inviting venture groups from all over the world to submit entries in a wide range of sectors. These initiatives are then reviewed by business veterans to establish the groups behind excellent design and development efforts of the previous 12 months.

This 12 months, the judges examined and analyzed the security efficiency, improvements, teamwork and excellence of round 90 submissions.  

Winners this 12 months embody 32 initiatives situated in 24 international locations on each continent besides Antarctica. These excellent examples present the dangers, rewards and hurdles overcome when designing and constructing internationally. The entire chosen initiatives can be spotlighted in additional element within the Dec. 15 situation of ENR. As well as, that particular situation will identify which of the winners will earn the coveted title of International Undertaking of the Yr.

Not one of the entries might take part if that they had any construction-related fatalities, and development needed to be full between January 2024 and Might 2025.

The panel of judges had discretion to designate high choices as International Greatest Tasks winners in a wide range of classes, and will select Award of Advantage winners as warranted. Study extra concerning the judges within the Dec. 15 situation of ENR.

This 12 months, everybody worldwide has an opportunity to rejoice these world development achievements and meet the groups behind the initiatives at ENR’s digital awards occasion. Better of all, there isn’t a price to attend. To be taught extra concerning the International Greatest Tasks awards presentation on December 18, please go to www.enr.com/global-best-projects.

Airport/Port

Greatest Undertaking: Marine Work PKG of Vung Ang II Thermal Energy Undertaking, situated in Ky Anh, Vietnam. Submitted by China Harbour Engineering Firm Ltd.

Award of Advantage: Undertaking Shamal Improvement – Topsides and Infrastructure Works, situated in Abu Dhabi, United Arab Emirates. Submitted by China Harbour Engineering Co.

 

Bridge/Tunnel

Greatest Undertaking:  Cross Bay Hyperlink and Related Works, situated in Hong Kong. Submitted by China Street and Bridge Corp.

Award of Advantage:  BC Freeway Reinstatement Program – Freeway 1 Nicomen River Bridge Substitute, situated close to Spences Bridge, B.C., Canada. Submitted by Kiewit Infrastructure BC ULC

 

Cultural/Worship

Greatest Undertaking:  Photo voltaic Boat Museum, situated in Cairo, Egypt. Submitted by Hassan Allam Building

Award of Advantage:  Sunner Museum, situated in Nanping, China. Submitted by Atelier Alter Architects

 

Schooling/Analysis

Greatest Undertaking:  Limberlost Place, situated in Toronto, Canada. Submitted by PCL Constructors Canada Inc.

Award of Advantage:  Markham Faculty Main Faculty, situated in Lima, Peru. Submitted by IDOM Consulting, Engineering, Structure

 

Authorities Constructing

Greatest Undertaking:  New U.S. Consulate Basic Mérida, situated in Mérida, Mexico. Submitted by BL Harbert Worldwide (BLHI)

 

Inexperienced Undertaking

Greatest Undertaking:  1265 Borregas, situated in Sunnyvale, Calif. Submitted by XL Building

 

Well being Care

Award of Advantage:  Sveti Apostol Luka Hospital, situated in Doboj, Bosnia and Herzegovina. Submitted by Shanxi Building Funding Group Co. Ltd.

 

Workplace

Greatest Undertaking:  The Henderson, situated in Hong Kong. Submitted by WSP Asia Ltd.

Award of Advantage:  Transformation of a listed constructing right into a Paris Proof workplace, situated in Delft, Netherlands. Submitted by Haskoning

 

Energy/Industrial

Greatest Undertaking:  Design and Construct Macau Refuse Incineration Plant – Part 3, situated in Macao. Submitted by China Harbour Engineering Co. Ltd.

Award of Advantage:  Mixed Cycle Implementation on the Santa Cruz Thermoelectric Plant, situated in Rio de Janeiro, Brazil. Submitted by Odebrecht Engineering and Building

Award of Advantage:  275kV Transmission Line Improvement From PMU New Prai To PMU The Gentle, situated in Penang, Malaysia. Submitted by China Harbour Engineering Co. Ltd.

 

Rail/Transit

Greatest Undertaking:  Sydney Metro – Crows Nest Station, situated in Sydney, Australia. Submitted by SJ Group and SMEC

Award of Advantage:  Line 4-5-6 Riyadh Metro, situated in Riyadh, Saudi Arabia. Submitted by FCC Construcción

Award of Advantage:  Fyrspåret Lund – Arlöv, situated between the cities of Lund and Arlöv, Sweden. Submitted by OHLA

 

Renovation/Restoration

Greatest Undertaking:  Zeinab Khatoun Residence, situated in Cairo, Egypt. Submitted by The Arab Contractors (Osman Ahmed Osman & Co.)

Award of Advantage:  Suez Canal Worldwide Museum, situated in Ismailia, Egypt. Submitted by The Arab Contractors (Osman Ahmed Osman & Co.)

 

Residential/Hospitality

Award of Advantage:  Riva Residence Tower, situated in Dubai, United Arab Emirates. Submitted by Khatib & Alami

 

Retail/Combined-Use Improvement

Award of Advantage:  Al Haffa Souq, situated in Salalah, Oman. Submitted by Dar Al-Handasah Consultants (Shair and Companions)

 

Street/Freeway

Greatest Undertaking:  Pindura-Bweyeye Street, situated in Rusizi, Rwanda. Submitted by China Street and Bridge Corp.

Award of Advantage:  Saaka Street and Bridge, situated in Pallisa District, Uganda. Submitted by The Arab Contractors (Osman Ahmed Osman & Co.)

Award of Advantage:  Muharraq Ring Street (Busaiteen Hyperlink), Bahrain, situated in Busaiteen, Bahrain. Submitted by AECOM

 

Specialty Building

Greatest Undertaking:  Absolutely Automated Pitch Changeover Answer on the Santiago Bernabéu Stadium, situated in Madrid, Spain. Submitted by Sener Mobility

Award of Advantage:  Implementation of GeoBarrier System at Furama Riverfront Resort, situated in Singapore. Submitted by Housing & Improvement Board (HDB), Singapore

 

Sports activities/Leisure

Greatest Undertaking:  Santiago Bernabeu Stadium, situated in Madrid, Spain. Submitted by FCC Construcción

Award of Advantage:  New Alamein Metropolis Vacationer Promenade, situated in New Alamein Metropolis, Egypt. Submitted by The Arab Contractors (Osman Ahmed Osman &Co.)

 

Water/Wastewater

Greatest Undertaking:  Julius Nyerere Hydropower Plant and Dam (JNHPP), situated in Morogoro, Tanzania, United Republic of. Submitted by The Arab Contractors (Osman Ahmed Osman & Co.)

Award of Advantage:  Arklow Wastewater Therapy Plant, situated in Arklow, Eire. Submitted by Ayesa Engineering

Trending Merchandise

0
Add to compare
- 5% CRAFTSMAN Pliers, 8 & 10″, 2Piece Groove Joint Set (CMHT82547)
Original price was: £21.00.Current price is: £19.98.

CRAFTSMAN Pliers, 8 & 10″, 2Piece Groove Joint Set (CMHT82547)

0
Add to compare
0
Add to compare
0
Add to compare
0
Add to compare
- 34% Ergodyne – 60144 Vented Hard Hat Cap Style, Ratchet Suspension, Class C, Skullerz 8972,White
Original price was: £45.45.Current price is: £29.95.

Ergodyne – 60144 Vented Hard Hat Cap Style, Ratchet Suspension, Class C, Skullerz 8972,White

0
Add to compare
.

We will be happy to hear your thoughts

Leave a reply

4LessLTD
Logo
Register New Account
Compare items
  • Total (0)
Compare
0
Shopping cart